GGrantIndex
← Search

THE PROPOSED PROJECT AIMS TO IMPLEMENT THE GKN METAL HYDRIDE STORAGE SYSTEM INTO WGL’S PROPOSED HYDROGEN CENTER AT 6801 INDUSTRIAL RD, SPRINGFIELD, VA AND WOULD VALIDATE THE SAFETY BENEFITS, COST-EFFECTIVENESS, AND PERFORMANCE CAPABILITIES OF THE GKN STORAGE SYSTEM FOR TWO APPLICATIONS. •THE OBJECTIVES OF BUDGET PERIOD 1 ARE TO COMPLETE A TECHNO-ECONOMIC ANALYSIS OF THE HY2MEDI-HS SYSTEM RELATIVE TO ALTERNATIVE STORAGE OPTIONS AND TO COMPLETE PRODUCTION, SHIPPING, ASSEMBLY, TESTING, INSTALLATION, AND COMMISSIONING OF THE UNIT AT THE PROJECT SITE. •THE OBJECTIVES OF BUDGET PERIOD 2 ARE TO ANALYZE THE COMPATIBILITY OF THE HY2MEDI-HS SYSTEM WITH OTHER ON-SITE EQUIPMENT AND TO VERIFY THE SYSTEM’S PERFORMANCE WITH RESPECT TO ROUND-TRIP EFFICIENCY, HYDROGEN FLOW RATE, AND OPERATIONAL PRESSURE AND TEMPERATURE RANGES IN BOTH APPLICATIONS. •THE OBJECTIVES OF BUDGET PERIOD 3 ARE TO COMPARE MEASUREMENT AND VERIFICATION (M&V) RESULTS OF THE HY2MEDI-HS, OPTIMIZE OPERATING CONDITIONS, VERIFY THAT NO SIGNIFICANT DEGRADATION TO SYSTEM PERFORMANCE HAS OCCURRED, AND VALIDATE THE SYSTEM’S ABILITY TO PROVIDE 60KG OF HYDROGEN FOR 2 CONSECUTIVE DAYS.

$0FY2023Department of EnergyDOE

Gkn Hydrogen Corp.

Investigators

View source on USAspending →