GGrantIndex
← Search

HIGH TEMPERATURE SUPERCONDUCTOR TRANSMISSION CABLE SYSTEM FOR INSTALLATION IN THE LONG ISLAND POWER GRID (LIPA 2)

$12,682,859FY2008Department of EnergyDOE

American Superconductor Corp

Investigators

View source on USAspending →