GGrantIndex
← Search

Maintenance and Improvement of NINDS Infrastructure

$1,168,423ZICFY2025NSNIH

National Institute Of Neurological Disorders And Stroke

Investigators

Linked publications & trials

Abstract

The following laboratories and research support areas underwent planning, modification, relocation, or renovations during FY 2025: 1. Equipment Modifications and renovation Animal Vivarium Facility,Location NIH Bethesda Campus, Bldg 35. 2. Neuroimmuelogy office cluster. Location: NIH Bethesda Campus, Bldg. 10. 3. Surgical Neurology Branch laboratories. Location: NIH Bethesda Campus, Bldg 10. 4. MRI siting evaluation. Location: Bethesda Campus. Bldg 35A. 5. Cell Biology and Biophysics Section. Location: NIH Bethesda Campus, Bldg 35 Minor Projects (SAT), including:  To connect the building CO2 system to EZ system smartbox  Completed- To investigate and restore a clogged vacuum line showing weak/non-existent suction power. Location: 35/3C313/315/317.  Completed - Installing red lights for two room in the animal holding rooms.  Completed – Install a 240 outlet for an ultracetrifuge  Completed – To remove a wall partition in the Porter Building.  Completed – A special outlet for a UPS for a Laser system in the Porter Building.  Completed – Modify the existing Getinge Steam Sterilizer (Autoclave) to a new control platform in the Porter Building.  Completed -- Refill glycol to the data central backup unit.Location 35/GC212  Completed – Streamlined BSC in the Porter Building. Location 35/2B410

View original record on NIH RePORTER →
Maintenance and Improvement of NINDS Infrastructure · GrantIndex