Maintenance and Improvement of NINDS Infrastructure
National Institute Of Neurological Disorders And Stroke
Investigators
Linked publications & trials
Abstract
The following laboratories and research support areas underwent planning, modification, relocation, or renovations during FY 2025: 1. Equipment Modifications and renovation Animal Vivarium Facility,Location NIH Bethesda Campus, Bldg 35. 2. Neuroimmuelogy office cluster. Location: NIH Bethesda Campus, Bldg. 10. 3. Surgical Neurology Branch laboratories. Location: NIH Bethesda Campus, Bldg 10. 4. MRI siting evaluation. Location: Bethesda Campus. Bldg 35A. 5. Cell Biology and Biophysics Section. Location: NIH Bethesda Campus, Bldg 35 Minor Projects (SAT), including: ï¶ To connect the building CO2 system to EZ system smartbox ï¶ Completed- To investigate and restore a clogged vacuum line showing weak/non-existent suction power. Location: 35/3C313/315/317. ï¶ Completed - Installing red lights for two room in the animal holding rooms. ï¶ Completed â Install a 240 outlet for an ultracetrifuge ï¶ Completed â To remove a wall partition in the Porter Building. ï¶ Completed â A special outlet for a UPS for a Laser system in the Porter Building. ï¶ Completed â Modify the existing Getinge Steam Sterilizer (Autoclave) to a new control platform in the Porter Building. ï¶ Completed -- Refill glycol to the data central backup unit.Location 35/GC212 ï¶ Completed â Streamlined BSC in the Porter Building. Location 35/2B410
View original record on NIH RePORTER →