GGrantIndex
← Search

BUILDING 436 - BACKUP POWER (WO#126555) AS RELATES TO REFURBISHMENT AND INFRASTRUCTURE IMPROVEMENTS WITHIN THE NCI AT FREDERICK CAMPUS

$282,340N02FY2022CANIH

Leidos Biomedical Research, Inc., Frederick MD

Investigators

Abstract

The objective of this work order is to put B436 on backup power. B436 houses the main steam condensate return for the south boiler plant. During extended power outages the condensate pumps do not operate. Without condensate return to the boiler plant there is insufficient treated water to operate the boilers. During a recent outage the boiler plant had to operate on untreated water in order to keep the boilers operating. Operating with untreated water can damage the boiler however loss of steam production is immediately detrimental to laboratory and animal building operations

View original record on NIH RePORTER →